GRG Building Consultants Inc - bridges

By: Grg Building  09-12-2011

Principals at GRG have assessed over 1 million square feet of bridges in Ontario, Nova Scotia, and Saskatchewan. Structures have included precast pre-stressed concrete, steel, wood, and cast-in-place concrete. Protocols for evaluation involve detailed bridge deck surveys, including sampling and testing, substructure and superstructure assessment, guards, drainage and approach assessment.


Other products and services from Grg Building

09-12-2011

GRG Building Consultants Inc - balconies

Careful review of shop drawings, welding, alloy selection, anchorage design, and resistance to specified and wind loads is needed to assure safe railings. While the symptoms may be similar to bridge and garage deterioration, the cause of balcony deterioration is different and requires a different approach. Balcony edge and surface spalling generally occurs after 15 to 25 years due to carbonation of the concrete in a moist environment.


09-12-2011

GRG Building Consultants Inc - reccentres

GRG has assessed and developed repair and replacement programs for recreation complexes ranging from single-pad arenas in small communities to the Etobicoke Olympium in Toronto. Our experience includes indoor and outdoor pools, indoor and outdoor ice pads, running tracks, grandstands, and indoor and outdoor court surfaces.


09-12-2011

GRG Building Consultants Inc - arbitration

Unlike the roster-type system available from some ADR organizations or the mandatory mediation programs implemented by some jurisdictions, employing GRG for ADR also offers technical expertise in the area under dispute. Jerry Genge, President of GRG, has completed the required educational programs and has been providing arbitration, mediation, and facilitation of settlement discussions since 1993.