Data and Integration | Projective Solutions

By: Projective Solutions  09-12-2011
Keywords: Planning Tools, Capacity Model

The Capacity Model and Planning Engine are electronically linked to your systems to ensure they have the most up to date information.  These data links are typically triggered on-demand by the planning team, but can also be configured to work in real-time or based on timed updates.  Projective’s planning tools can and have been linked to almost any information system.

The system queries order, inventory and production databases to gather all information related to the planning process.  These tools are designed to minimize data inputs from the user, allowing the planners to focus on the business problem at hand.  Critical data is validated during the import process to ensure that decisions are made based on reliable information.

An application database is configured to house information specific to the planning tool and to facilitate communication with outside systems.  Projective systems typically provide archiving of decisions and their expected impact.  These decisions and reports can be exported to your systems or accessed via your business intelligence tools.  Projective’s development teams are experienced with several database platforms and will build your application database using whichever is currently in use within your business.

Keywords: Capacity Model, Planning Tools,

Other products and services from Projective Solutions

09-12-2011

User Interface | Projective Solutions

Our interface allows your team to work with the plan, modifying and testing based on your experiences, and manually overriding it in the case of unexpected situations. These tools can support multiple users spread throughout different departments and facilities, providing a valuable communication and collaboration tool.


09-12-2011

Production Model | Projective Solutions

Constraints such as lot sizing, resource shift patterns, batch constraints, travel/transfer times, and setup considerations are captured in detailed knowledge tables. This model details the physical workings of the plant including operating rules, product routings, process times, materials and resource requirements.


09-12-2011

Planning Engine | Projective Solutions

Projective typically provides weighted planning routines to allow the end user to test multiple plans and adjust planning methods based on current business conditions. Our consultants draw on the knowledge of your planning team and a library of optimization techniques and heuristics to design routines specific to your processes.


09-12-2011

Scheduling | Projective Solutions

The pages in this section detail the Projective approach to Scheduling problems, building upon the four quadrants of the Projective toolkit; Production Model, Scheduling Engine, Data & Integration, and User Interface. Projective Scheduling Solutions generate detailed, station or machine-specific schedules on a minute-by-minute basis that consider performance at both the station and facility level.


09-12-2011

Capacity Model | Projective Solutions

This model is developed prior to the start of any planning efforts, providing the project teams with invaluable insight into how the overall system actually works. The Capacity Model is an integral part of Projective’s planning systems, capturing the detailed workings of the process. The completed Capacity Model is used as a base for development of the Planning Engine.


09-12-2011

Solutions | Projective Solutions

Detailed, minute-by-minute schedules by machine or production centers, including all relevant details on changeover times, downtimes, machine settings, and resource requirements. Applications: Allocating orders to multiple facilities; planning raw material requirements based on current order forecast. Scope: Generally include a wide process view, considered at a somewhat limited level of detail.