Capacity Model | Projective Solutions

By: Projective Solutions  09-12-2011
Keywords: Capacity Model

The Capacity Model is an integral part of Projective’s planning systems, capturing the detailed workings of the process.  This model is developed prior to the start of any planning efforts, providing the project teams with invaluable insight into how the overall system actually works.  The completed Capacity Model  is used as a base for development of the Planning Engine. 

Elements captured in these models include:

  • Process flows
  • Inventories
  • Production and supply lead times
  • Bottleneck resources
  • Downtime calendars
  • Planned maintenance

Development of the capacity model helps to identify the unique characteristics of the process to be planned and the data required to make decisions.  The model captures the details of the process and uses them to constrain solutions, ensuring that all recommended decisions from the completed system are feasible and all relevant information has been accounted for.

Keywords: Capacity Model

Other products and services from Projective Solutions


User Interface | Projective Solutions

Our interface allows your team to work with the plan, modifying and testing based on your experiences, and manually overriding it in the case of unexpected situations. These tools can support multiple users spread throughout different departments and facilities, providing a valuable communication and collaboration tool.


Production Model | Projective Solutions

Constraints such as lot sizing, resource shift patterns, batch constraints, travel/transfer times, and setup considerations are captured in detailed knowledge tables. This model details the physical workings of the plant including operating rules, product routings, process times, materials and resource requirements.


Planning Engine | Projective Solutions

Projective typically provides weighted planning routines to allow the end user to test multiple plans and adjust planning methods based on current business conditions. Our consultants draw on the knowledge of your planning team and a library of optimization techniques and heuristics to design routines specific to your processes.


Data and Integration | Projective Solutions

Projective’s development teams are experienced with several database platforms and will build your application database using whichever is currently in use within your business. These data links are typically triggered on-demand by the planning team, but can also be configured to work in real-time or based on timed updates.


Scheduling | Projective Solutions

The pages in this section detail the Projective approach to Scheduling problems, building upon the four quadrants of the Projective toolkit; Production Model, Scheduling Engine, Data & Integration, and User Interface. Projective Scheduling Solutions generate detailed, station or machine-specific schedules on a minute-by-minute basis that consider performance at both the station and facility level.


Solutions | Projective Solutions

Detailed, minute-by-minute schedules by machine or production centers, including all relevant details on changeover times, downtimes, machine settings, and resource requirements. Applications: Allocating orders to multiple facilities; planning raw material requirements based on current order forecast. Scope: Generally include a wide process view, considered at a somewhat limited level of detail.