Biggs & Narciso - demolition

By: Biggs & Narciso Construction Services  09-12-2011
Keywords: Demolition, Asbestos abatement, Environmental Abatement

Since the majority of our asbestos abatement projects required some type of demolition, it was logical step for Biggs and Narciso to offer demolition as part of our service package. The scope of our demolition work now ranges from selective demolition of a single room, to completely gutting a building to its bare structure allowing for reconstruction. Our demolition services today often do not include environmental abatement services but are part of a retrofit or renovation construction project. Depending on the scope of the project, demolition work can often be done while the building is still in use. Many of our larger scope demolition projects have been carried out to accommodate a new interior design.

Biggs and Narciso can work with you to plan your demolition project from start to finish. We will survey the site and provide you with a detailed, written estimate that outlines every phase of the demolition project. As the work proceeds, we will keep you fully informed so that you are aware of our progress at every stage. Biggs and Narciso will complete the project on time and within the allocated budget. We are also fully insured to protect against liabilities. If you are anticipating a reconstruction that requires demolition of existing components, call us with complete confidence that we can do the job safely, efficiently and cost effectively.

Keywords: Asbestos abatement, Demolition, Environmental Abatement, Environmental Abatement Services

Contact Biggs & Narciso Construction Services

Email - none provided

Print this page

Other products and services from Biggs & Narciso Construction Services

09-12-2011

Biggs & Narciso - fireproofing

Spray applied products include cementitious and mineral fibre applications provide up to 4 hour fire ratings; acoustical applications yield noise reduction coefficient ratings up to 1.05 and thermal ratings are 3.85 per inch of material applied.


09-12-2011

Biggs & Narciso - pcbs

They were used in many different types of products including hydraulic fluid, casting wax, pigments, carbonless copy paper, plasticizer, vacuum pumps, compressors and heat transfer systems. We ensure that any such equipment is properly extracted and sealed in government regulation drums, properly labeled and shipped to a registered storage facility to await destruction.


09-12-2011

Biggs & Narciso - asbestos removal

Biggs and Narciso understand the risks and the importance of proper procedures when working with asbestos removal and how to dispose of asbestos so that there are no continued risks. These materials are extremely resistant to acid and fire making them highly attractive for use in manufacturing building materials subject to extreme heat or acidic conditions.


09-12-2011

Biggs & Narciso - mould removal

We will not only remove and repair the affected areas, but will also identify and fix the root cause of the problem to prevent any reoccurrence of mould. The presence of moisture is essential for moulds to grow and they are therefore usually found in damp, poorly ventilated areas. Simply limiting sources of moisture and condensation and improving ventilation can reduce the presence of mould spores.


09-12-2011

Biggs & Narciso - lead removal

Clean up should be done with a HEPA (High Efficiency Particulate Air Filter) vacuum cleaner to ensure a thorough pickup is done without releasing more lead particulates into the air. We will retrofit plumbing to building code specifications and renovate to a finished condition ready for occupation – completely lead free. Waste containers should be properly labeled as containing lead contaminated material and disposed of as hazardous waste.