By: Artistic Stone Design  09-12-2011
Keywords: Artistic Stone Design

** Ask us about our annual re-sealing special**
OUR PROCESS At Artistic Stone Design Inc., client satisfaction is always our first priority. The following information is important to insure your project is completed accurately and on time.
Our process begins with selecting your material, colour and edge profile. Bring any small objects like cabinet door, tile, wallpaper and paint chips to determine colours and styles that will best suit your needs. Our expert staff is here to assist you in your decision making process.PRIOR TO TEMPLATINGOur first visit to your home will be to measure and template your project. Prior to this, you must ensure all cabinets are sturdily fixed to the walls and floors and that they are in their permanent position. If you have chosen an undermount sink, the template must be on site at the time of templating. For drop-in sinks, cooktops, slide-in stoves and faucets, we require either the specification sheet or the appliance on site.After templating is complete, your project is then fabricated by our team of specialists. PRIOR TO INSTALLATIONPrior to your installation date, you must have your existing sink, faucet and cooktop or stove disconnected and removed. If there is an existing countertop in place, it must be removed by the client unless we have agreed before hand to do so. We are not responsible for any plumbing, gas, electrical or leveling of cabinets. If your project consists of a bar or island, brackets must be in place prior to installation. INSTALLATIONIn order for us to complete our installation efficiently, we ask that the site be ready. Please provide a clear path for our installers to move quickly and without injury. It is also important that our workman leave their safety shoes on at all times. Therefore, in order to protect your floor during inclement weather, please cover the floor area with cardboard or other non-slip covering. All sinks, faucets, cooktops or slide-in stove must be on site in order to avoid any additional charges. A minimum of 24 hours is required for the countertop and sink to set prior to reconnecting the plumbing.We will do our best to minimize any dust and debris the installation may cause. We will also remove any leftover material and debris and leave the area in broom swept condition.
Copyright © 2008 Artistic Stone Design Designed By:

Keywords: Artistic Stone Design